My Work History Time Line

 


My New CV

 




Golf Suits Project




From                     June 2021 till January 2023 

Duration                : 1 Years, 8 Months

Main Contractor    : PIC Parkway International Contracting Company

Consultant              : Khatib & Alami Consolidated Engineering Consultants

Owner                     : EMAAR

Location                  : Dubai Hills

Position                    : Technical Architect Manager

Value                        : 133 M dhs

Total Built up Area    : 416767 Square Feet

Project Height            : Basement + Ground + Podium + 1 to 18 floors + Roof + Upper Roof

Projects Elements      : 211 Apartments (1Bed, 2Bed & 3Bed ) - 261 car parking - Main Swimming pool - Kids' Swimming pool - Infinity Swimming pool - Gym - Community Hall

Job Description         : Coordination drawings, Shop drawings, Site Reports & Handover stage


































DHA 3 Health Center

     





From                     December 2020 till May 2021 

Duration                : 

Main Contractor    PIC Parkway International Contracting Company

Consultant              : K

Owner                     : E

Location                  : D

Position                    : Technical Architect Engineer

Value                        : 145 M dhs

Total Built up Area    : 4Square Feet

Project Height            : Basement + Gro

Projects Elements      : 211 

Job Description         : Coordination drawings, Shop drawings, Site Reports & Handover stage

S19 Al Jadaf Hotel

From                     December 2020 till May 2021 

Duration                : 

Main Contractor    PIC Parkway International Contracting Company

Consultant              : K

Owner                     : E

Location                  : D

Position                    : Technical Architect Engineer

Value                        : 145 M dhs

Total Built up Area    : 4Square Feet

Project Height            : Basement + Gro

Projects Elements      : 211 

Job Description         : Coordination drawings, Shop drawings, Site Reports & Handover stage

Mudon Views Project

From                     December 2020 till May 2021 

Duration                : 

Main Contractor    PIC Parkway International Contracting Company

Consultant              : K

Owner                     : E

Location                  : D

Position                    : Technical Architect Engineer

Value                        : 145 M dhs

Total Built up Area    : 4Square Feet

Project Height            : Basement + Gro

Projects Elements      : 211 

Job Description         : Coordination drawings, Shop drawings, Site Reports & Handover stage

في الفتره من 20/3/2010 الي الآن

المكتب : مكتب هاي آرك للاستشارات الهندسه بدوله الامارات العربيه المتحده
صاحب المكتب : المهندس عماد
شروعات : مجموعه من المباني والفيلات السكنيه
العمل : أعداد الرسومات المعماريه المبدئيه والاخراج الفني
أعمال الرسومات المعماريه التنفيذيه
أعمال طرح المناقصات علي المقاولين
الوظيفه : مهندس معماري
http://www.highart-ae.com/
http://www.models-ae.com/

في الفتره من 21/6/ 2007 الي 1/3/2010

الشركه : شركه محمد عبد المحسن الخرافي وأولاده بدوله الامارات العربيه المتحده
صاحب الشركه : محمد عبد المحسن الخرافي
المشروع : مشروع مجمع المكاتب والمركز الرئيسي لمطار جبل علي
حوالي مبني رئيسي و عشره مباني أدارايه واربع مباني خدمات
وأعمال الطرق تشمل الطرق الداخليه والخارجيه
وأعمال تنسيق الموقع واللاندسكيب
العمل : اعداد رسومات الورشه للمباني
أعداد رسومات الورشه لأعمال المرافق في شبكه الطرق
بعض أعمال الحصر
أخذ الموافقات من الدوائر الحكوميه المختلفه والمناقشات الفنيه
الوظيفه : مهندس مكتب فني بالموقعhttp://www.kharafinational.com/kn/index.html